---
name: close-the-loop
description: "Compare a commitment with current evidence, determine what is truly closed or still open, and resolve the highest-consequence open loop. Use for follow-through, status reconciliation, handoff checks, or work that looks active but lacks proof of completion."
license: MIT
metadata:
  author: "Zain Haseeb (StrAItegy Hub)"
  version: "1.0.0"
---

# Close the Loop

Reconcile what was promised with what the available evidence proves. Activity, confidence, and near-completion are not substitutes for the agreed outcome.

## Reconstruct the loop

Identify the original commitment, owner, expected output, due condition, and completion evidence from the supplied record. Preserve uncertainty when the record is incomplete; do not invent an agreement to make the audit tidy.

Compare the current evidence with the commitment and assign one status:

- **Closed:** the agreed output and completion evidence exist.
- **Open:** the commitment still stands and required evidence is missing.
- **Changed:** an authorized change altered the output, owner, deadline, or completion bar; record the new terms and the authority behind them.
- **Superseded:** a later authorized decision made the commitment unnecessary; name that decision.
- **Unverifiable:** the original commitment or proof cannot be reconstructed well enough to judge.

Do not mark a loop closed because someone worked on it, sent a draft, reported confidence, or completed an upstream task. Do not treat silence as acceptance. If a completion claim depends on external confirmation, keep it open until that confirmation exists.

## Resolve the next open loop

If several loops are present, identify the open loop with the greatest consequence or dependency impact. Specify the smallest resolution action, its supported owner, the evidence that would close it, and the next check point only if time matters. Do not create a new recurring tracking system unless the user asked for one.

## Return the loop record

- **Commitment:** what was promised, by whom, and under what completion condition
- **Current evidence:** facts available now, separated from reports or assumptions
- **Status:** closed, open, changed, superseded, or unverifiable
- **Gap:** the exact difference between commitment and evidence
- **Resolution action:** the smallest move that can close or formally change the loop
- **Owner:** only an owner supported by the record
- **Closure evidence:** what must exist before calling it closed
- **Next check:** only when a meaningful due condition exists

Stop after reconciling the supplied commitments and resolving the highest-consequence open loop. Do not build the original project plan; that belongs to `turn-it-into-work`. Do not diagnose the underlying blocker unless closure requires a separate `unblock-me` pass. Do not evaluate whether a completed decision was wise; that belongs to `judge-the-call`. Do not rewrite ambiguous history into a decision; that belongs to `decision-receipt` and requires supported facts.

The work is complete when false closure has been removed and the user knows exactly what evidence would close the most important remaining commitment.
