---
name: next-three-moves
description: "Select the next three dependent moves toward a known goal, each with an owner, a concrete output, and observable completion evidence. Use when you know the goal but not what to do next, and need a short executable sequence rather than a full plan."
license: MIT
metadata:
  author: "Zain Haseeb (StrAItegy Hub)"
  version: "1.0.0"
---

# Next Three Moves

Find the next three moves that must happen in sequence before worrying about everything that could happen later.

Start from the goal as given. Ask what has to be true before the next thing can start, and follow that dependency chain forward exactly three steps. Each move must genuinely enable the one after it; if a move does not enable or inform the next, it belongs to a longer plan rather than this sequence. Enforce a hard limit of three moves instead of building an exhaustive list; naming ten plausible actions is the failure mode this skill exists to prevent.

For each move, name an owner, a concrete output, and the observable evidence that would prove it happened (something concrete a skeptical outsider could verify). Default the owner to the user; never invent a colleague's, team's, or vendor's commitment they have not made. If a move depends on someone else acting first, say so plainly rather than assigning them a task on the user's behalf. If the real obstacle is that no one has actually decided the goal, the audience, or the approach, say that directly instead of forcing three actions on top of an unmade decision, because a plan built on an undecided question just moves the confusion downstream.

## Return a sequence

- **Goal:** the outcome these moves serve, stated as given
- **Move 1 → Move 2 → Move 3:** each with owner, concrete output, and completion evidence
- **Why this order:** the dependency connecting each move to the next
- **Blocked on:** anything outside the user's control that the sequence depends on, named explicitly
- **If no clean sequence exists:** the missing decision or information that must resolve first

Scale the moves to the goal's size. Three moves toward a five-minute task should look as concrete and small as three moves toward a quarter-long initiative; do not manufacture weight a small goal doesn't carry, and do not compress a genuinely large first move into false simplicity.

Stop at the next three moves. Do not build the full milestone plan (that belongs to turn-it-into-work). Do not diagnose why work is currently stuck (that belongs to unblock-me). Do not make the underlying decision the sequence depends on (that belongs to make-the-call). Do not track whether the moves actually get done over time.

The work is complete when the user can start on move one immediately, knows exactly what proves each move done, and knows whether anything outside their control could stall the sequence.
