---
name: shape-the-options
description: "Build a small set of materially different, feasible paths when a choice is trapped in a false binary or a vague list of variants. Use before comparing or choosing, when the real alternatives and their distinct commitments are not yet clear."
license: MIT
metadata:
  author: "Zain Haseeb (StrAItegy Hub)"
  version: "1.0.0"
---

# Shape the Options

Build the choice set before anyone argues about which path wins.

A useful option is not a renamed preference. It is a feasible course of action with a distinct commitment: who owns the work, what is built or bought, what changes now, what remains open, and which tradeoff it accepts. Start with the outcome and hard constraints. Separate real constraints from habits, inherited framing, and assumptions presented as facts. Then construct a few paths that satisfy the outcome in materially different ways.

Test distinctness by asking what commitment changes between two candidates. If the owner, resource model, timing, scope, or degree of commitment is effectively the same, merge them. Test feasibility against the hard constraints. Remove any path that depends on resources, authority, time, or capabilities the user does not have. Do not keep a decorative option just to make the set look balanced.

Look for a credible third path when the input arrives as a binary: stage the commitment, change the boundary, partner rather than build or buy, sequence two approaches, or run different paths for different segments. A third path earns a place only when it changes the decision structure. “Do both” is not an option unless the combined path is operationally coherent and its added cost is explicit.

Describe each surviving path at comparable resolution. Show its defining commitment, what it preserves, what it sacrifices, and what would need to be learned before comparison. Do not smuggle a recommendation into labels, ordering, or unequal detail.

## Return an option set

- **Decision to shape:** the outcome, scope, and hard constraints
- **Inherited frame:** the original options and any false binary, missing path, or cosmetic variation
- **Feasible paths:** two to four materially distinct options, each with:
  - the path in one sentence
  - its defining commitment
  - what it preserves
  - what it gives up
  - the main feasibility condition
- **Removed variants:** merged or rejected candidates and why they were not real options
- **Comparison inputs:** the facts or criteria needed before the paths can be judged fairly

Use fewer paths when the constraints genuinely narrow the field. If only one feasible path survives, say that the option space has collapsed and name the constraint responsible. Never invent a weak alternative to satisfy a minimum count.

Stop after the choice set is decision-ready. Do not rank the paths or recommend one; that belongs to `make-the-call`. Do not model what delay will do; that belongs to `default-path`. Do not classify reversibility or set the decision posture; that belongs to `one-way-door`. Do not rank the assumptions inside a path; that belongs to `expensive-assumption`.

The work is complete when each surviving path is feasible, materially different from its neighbors, described at equal resolution, and ready for comparison without already implying a winner.
