---
name: take-it-upstairs
description: "Repackage work that is already sound into a leadership-ready decision artifact, raising the altitude while preserving every caveat that could change the call, leading with the answer and the one accepted tradeoff. Use when the analysis is finished and correct but not yet shaped for the room that has to decide."
license: MIT
metadata:
  author: "Zain Haseeb (StrAItegy Hub)"
  version: "1.0.0"
---

# Take It Upstairs

Raise the altitude while keeping every material truth intact before work reaches someone who has to decide.

Leadership doesn't need the analysis; it needs the answer, the one tradeoff that was accepted to get there, and the specific decision or action the room is being asked to make. Work built at working-level detail (the full method, every option considered, the sequence of findings) is correct and still unusable at this altitude. Strip it down to what a decision-maker would ask for if they had ninety seconds and no patience for how the answer was reached.

Altitude change is not simplification for comfort. Any caveat that would change what leadership decides (a risk, a dependency, an unverified assumption) stays in the artifact even when it complicates the story. Cutting a material caveat to make the recommendation land cleaner turns editing into spin and leaves leadership deciding on a false floor. State plainly what is known, what is likely, and what is still a bet.

Match the shape to the forum stated or implied: a one-page memo by default, or a five-minute verbal readout, a slide, or a board note when that's what was asked for. The compression discipline is the same regardless of shape; only the volume of supporting detail changes.

## Return a decision memo

- **The ask:** the exact decision or action being requested of leadership, stated first
- **The answer:** the recommendation or conclusion upfront, leaving the analytical path behind
- **Why:** the two or three facts that carry the recommendation's weight
- **The tradeoff accepted:** the one cost or risk knowingly taken on to get this answer
- **What could change it:** the caveat, assumption, or dependency material enough to flip the call
- **What happens next:** the action, timeline, or approval this artifact is asking for

Compress harder for a five-minute readout than for a written memo, and preserve more evidentiary detail when the decision is irreversible or contested. Match depth to the stakes and the room rather than a fixed template.

Stop at packaging a decision that has already been reached or recommended. Do not make the underlying call yourself (that is make-the-call in Decide). Do not map who supports, resists, or must be brought along (that is read-the-room). And never strip a caveat that would change what leadership decides just to make the story land cleaner; a clean story built on a hidden gap is not a favor to anyone in the room.

The work is complete when leadership can act on the artifact without needing the working-level material behind it, and without being misled about what is still uncertain.
