Find the bottleneck behind late handoffs

Paste a process and the evidence you have. Get the step that is really holding work up, a check to confirm it this week, and fixes to try before spending money.

Use this when

Use this when work keeps arriving late at the end of a process and every team says the delay is somewhere else.

What you get

  • Process table with evidence per step
  • The constraint, with confidence
  • One check to run this week
  • Up to three fixes with owners

Fill in the blanks

the prompt updates as you type

List the steps in order with the team or role that owns each one.

The delay you can see, the target, and since when.

Queue counts, timestamps, rework rates, or what each team told you. Say where each piece came from.

Budget, headcount or system limits the fix has to live within.

The fields are filled in this tab. The site can count a copy without collecting what you wrote.

0 of 4 blanks filled · still needed: process steps and who does each, what is late, and how often, evidence you have

Goal

Act as an operations analyst. Use Eliyahu Goldratt's theory of constraints to find the one step that limits how fast work moves through this process, so I can decide what to fix first and brief the process owners.

Context

Process steps and who does each: [Process steps and who does each]

What is late, and how often: [What is late, and how often]

Evidence you have: [Evidence you have]

What you cannot change (optional): [What you cannot change]

Before you start

If any required item above is missing, still shows a [bracketed label], or is too vague to act on, ask me up to three short questions, one at a time, and wait. Items marked (optional) can stay blank. Otherwise begin.

Steps

1.Lay out the process as a chain of steps with the owner and the handoff for each. Mark any owner that is Not stated.

2.For each step, write what the evidence says about waiting, piling up and rework. Quote the evidence and say where it came from. Where there is none, say so.

3.Name the most likely constraint: the step where work waits longest or piles up, which may not be the step people complain about most. Name the runner-up.

4.Say what would prove you wrong: one piece of data I could pull this week that would confirm or kill the call.

5.Suggest up to three fixes in Goldratt's order: stop wasting the constraint's time, feed it better work, and only then add capacity.

Output

1.Process table: step, owner, handoff, evidence of waiting or rework, source. 2) The constraint call in two sentences, with confidence (high, medium or low) and why. 3) The check to run this week. 4) Up to three fixes, each with an owner role and a first action. Under 400 words.

Rules

Use only what I gave you. Write "Not stated" for anything missing.

Label anything you infer as "Inferred".

A loud complaint is not evidence. Weigh queue sizes and timestamps above opinions.

If the evidence cannot separate two steps, call it a tie and name the data that would break it.

Plain language. No filler openings. No em dashes.

Where this breaks

read before you rely on it

It only sees what you paste. If your evidence comes from one team, the bottleneck tends to land on whoever was not in the room. Pull timestamps from the system of record before you act on the call.

Follow-up asks

paste after the first answer
  • Write a short note to the owner of the step you named as the constraint, explaining the evidence and asking whether it matches what they see.
  • Turn the check you suggested into a blank table with the columns I need to fill in from our system.
  • Assume the constraint is really the runner-up step. What would I expect to see in the data if that were true?