Variance bridge from plan to actual
Break a plan-to-actual gap into its drivers, flag what is timing versus permanent, show what is still unexplained, and list the questions to send.
Use this when
Use this during month-end when you have the numbers but need to explain the gap to your finance director before the commentary deadline.
What you get
- Driver-by-driver bridge with volume, mix, price and FX
- Unexplained remainder in the reporting currency
- Three-sentence summary for the pack
- Questions to send to owners
Fill in the blanks
the prompt updates as you type0 of 3 blanks filled · still needed: metric and period, the numbers by line
Goal
Act as an FP&A analyst preparing a variance bridge for a finance director. Explain the gap between plan and actual, driver by driver, and be clear about what is still unexplained.
Context
Metric and period: [Metric and period]
Numbers by line: [The numbers by line]
What the business told us (optional): [What the business told you]
Before you start
If any required item above is missing, still shows a [bracketed label], or is too vague to act on, ask me up to three short questions, one at a time, and wait for my answers. Items marked (optional) can stay blank. Otherwise begin.
Steps
1.Use one sign convention throughout: favourable is positive, adverse is negative, for revenue and cost lines alike. A cost that came in above plan is negative. Calculate the total variance.
2.Split revenue into volume (change in total units times the planned average price), mix (actual units at planned prices, minus actual total units at the planned average price) and price (actual units times the change in price). If the data has no split by product or customer, report one line labelled "Price and mix combined". Where amounts are in another currency, separate FX (actual foreign amount times the change in rate) from the constant-currency change. Treat each cost line and one-off as its own driver. Show every calculation.
3.Add up the drivers and compare to the total. Any difference is "Unexplained", in the reporting currency.
4.Match each driver to an explanation from the business, or mark it "No explanation yet". Classify it as Timing (will reverse in a later period), Permanent, or Unknown, with the reason.
5.List the questions to send to the people who can close the gaps, one per person.
Output
First line: "Sign convention: favourable positive, adverse negative." Then a bridge table with columns: Driver, Amount, Share of variance, Timing or permanent, Explanation and source, with lines for "Unexplained" and "Total". Then a three-sentence summary a finance director could paste into the pack. Then "Questions to send" grouped by person or team.
Rules
Use only what I gave you. Write "Not stated" for anything missing.
Label anything you infer as "Inferred".
Show the arithmetic so I can check it in the spreadsheet. If the inputs do not add up, say so before anything else.
Do not treat a business explanation as confirmed. Say who gave it.
Plain language. No filler openings. No em dashes.
Source notes
- Of 24 late orders in the pilot, 18 were waiting for manager approval.
- The team logged delay reasons for four weeks.
Draft conclusions
- Approval was the most common recorded delay.
- Same-day approval would cut the overall late-order rate.
Where this breaks
read before you rely on itChat models can still slip on arithmetic, especially signs on cost lines, so recheck every figure in Excel. At a listed company, results before release are inside information and many policies keep them out of every AI tool until then, so check yours first.
Follow-up asks
paste after the first answer- Rewrite the summary for a business leader who is not a finance person.
- Which drivers should I expect to reverse next period, and by how much, using only the figures I gave you?
Related prompts
same function first, then same moment- Two reports, two numbers: find out whyWhen two reports show different figures for the same thing, list the likely reasons, the questions for each owner, and which number to use for now.Finance · Understand
- Business case review before approvalReview a business case like a finance partner: find missing costs, separate cash from soft benefits, test the key assumption, and give a verdict.Finance · Decide
- Build, buy or defer: the full-cost viewCompare building, buying or waiting on a capability over three years, counting internal time and running costs, and get a call with what would flip it.Finance · Decide